Design & Build: one clear path from first sketch to final handover.
Too often, custom homes are designed first and priced later, leaving budgets stretched and plans needing to be reworked.
At Fortress, we bring design, cost and construction together from day one. From the first idea to handing over the keys, we keep your vision, budget and buildability aligned, with clear communication and no surprises. Here’s how we make it happen.
Four stages, start to finish…
Clear, staged agreements. Each stage has a defined purpose and something concrete you walk away with, whether it’s a renovation, an extension or a new home, so you’re never committing to the whole journey on day one.
Stage 1
Talk
We’ll come back to you after your enquiry, then book in a first meeting as soon as we can.
We’ll start with a conversation, discuss what you’re after and let you know whether it’s something we can help with. We’re often booked ahead, so if it is, we’ll offer you a place on our list for a first meeting and keep you posted.
When we meet, we talk it through properly: your ideas, pictures, wish list and budget. We look at the existing building, or the site if it’s a new build, and pull it all together into a brief. It’s the right time to ask questions and explore what’s possible, and what’s not worth doing.
You’ll have: a clear brief, a strong idea of the concept and an estimated guide to cost, so you can decide whether to progress into a design agreement.
What happens in more detail
- We review your enquiry and tell you whether we can help
- If we can, you go on our list for a first meeting
- We meet, talk it through and look at the building or site
- Your ideas, pictures and priorities become a written brief
- We outline a basic concept and give you an estimated cost
- You decide whether to go ahead to the design stage
It helps to have a few photos of the space, any ideas or inspiration you’ve collected, existing plans if you have them, and a rough budget range.
Stage 2
Design
Typically 3 to 6 months, depending on complexity, and often less for smaller additions and renovations.
Design is where your project really takes shape.
It begins with a Preparation of Plans Agreement (PPA). A PPA is a retainer that engages us to develop your design into a fully resolved project, ready to be priced and built. The retainer is drawn down as the work progresses, and it stops short of the building contract, which comes in the next stage. At this point you’re not committing to build: your only commitment is the PPA itself, and you’re only charged for the work as it’s done.
The reports that shape the design are done at this stage, not left until later. Energy efficiency and BAL (bushfire attack level) assessments, for example, can have real implications for the structure and design of a building. We also work out the site works properly, because on many projects they’re a major part of the cost and easy to underestimate.
Sometimes it becomes clear during design that part of your project needs development approval from the council or shire. If so, it can be done during this stage, but it’s handled separately from the PPA.
Because we’re the builder, the design is checked for buildability and cost the whole way through. Your selections and specification start from our Foundation Specification, the standard of inclusions built into every Fortress home. Drawings and revisions are shared through your Fortress Client Portal as the design develops.
You’ll have: a fully developed design, with the drawings, selections and finishes (and engineering where needed) worked through and ready to price.
What a PPA typically covers
- Drafting and design development
- Site surveys
- Reports, including energy efficiency and BAL (bushfire attack level) assessments
- Site works requirements
- Engineering
- Selections, finishes and specification, starting from our Foundation Specification
- Coordinating the consultants involved
The retainer is drawn down as each part of the work is completed, so you can see where it’s going at every step.



Stage 3
Price
Usually 2 to 4 weeks, depending on complexity.
This is where the design is properly priced. We check it against the initial estimate and let you know about any areas where the cost has changed, and why.
The aim is to reduce the unknowns. Rather than a contract full of provisional sums and prime cost items, allowances that can end up costing more or less than expected, we price as much as we can properly up front. Sometimes PS and PC items are still necessary, but keeping them to a minimum reduces the risk of surprises and the need for variations later on.
Your selections and inclusions are priced properly by our suppliers, and everything comes together in a detailed proposal, with the building contract drawn up and ready to sign if you decide to go ahead with us into the build.
Most projects are built under a fixed-price contract. In some situations a cost-plus contract may suit you better, and if so, we’ll talk it through with you. Signing the contract is the commitment point: it’s where you engage Fortress to bring your plans to life.
We’ll also review our construction slots and offer you the next available start that lines up with your approvals and your own timing. Our builds run to a structured programme with set start dates, offered in order as projects are ready, so each one gets the right focus at the right time and you’ll know well ahead when yours will begin.
You’ll have: a detailed proposal, usually at a fixed price, and a building contract ready to sign if you choose to proceed.
What happens in more detail
- The full design is priced against the initial estimate
- Any changes in cost are flagged and explained
- Selections and inclusions are priced by our suppliers
- Provisional sums and prime cost items kept to a minimum
- Everything is combined into your detailed proposal
- We offer you the next available construction slot that suits your approvals and timing
- The building contract is drawn up (usually fixed price, sometimes cost-plus), ready to sign

Stage 4
Build
A programme with realistic dates before work starts.
The build is a stage in its own right, run in clear steps from approvals through to handover, with regular updates through your Fortress Client Portal along the way.
Approvals and pre-constructionBecause most of the information is already prepared in the design stage, approvals don’t take long. Engineering (usually 4 to 6 weeks) and any development approval are often done during design as part of the PPA; if not, they happen at this stage. The building permit itself is relatively quick, about 3 weeks on average. Once the building permit and any other approvals are in place and your agreed construction start date is approaching, we complete the pre-construction requirements, ready to start on site.
Site works and foundationsOn-site work begins with preparing the site, then any retaining. The plumbing and electrical pre-lays and drains go in next, followed by the foundations or slab. It’s the groundwork everything else is built on, so it’s done to the engineering requirements and set out carefully before anything goes up.
New builds. The block is prepared with a rough cut or sand pad, any retaining walls go in, and the footings and slab are then poured.
Renovations and additions. Work starts with demolition or strip-out of the areas being changed, with the rest of the house protected. New footings or a slab for any extension are then prepared and tied into the existing building.

StructureThis is where the building goes up: brickwork or timber-framed walls, structural steel where it’s needed, through to the roof framework. It’s a substantial part of the build and usually the longest step, and it’s the first time you see the true scale of your project. Everything is built to the engineering requirements, with inspections where required, and it’s a good time to walk through with us and get a real feel for the rooms and how the spaces flow.
Two-storey homes. The ground-floor walls go up first, followed by the first-floor structure: the floor the upper level sits on, with steel beams where the engineering calls for them. The upper-floor walls are then built on top before the roof goes on. Working at height means scaffolding goes up around the building, and anything involving a second storey takes a little longer.
Renovations and additions. This is where walls come out, beams go in and the new structure is tied into the existing building. We keep the house supported and weathertight as we go, and plan the work around how you’re using the home in the meantime.
Wind and watertight, then lock-upWhatever the type of project, this step follows the same pattern: the building is made wind and watertight. The roof covering goes on, and the external cladding, brickwork or render finishes are completed. Windows and external doors then go in, bringing the building to lock-up. Before the inside is lined, the plumbing and electrical rough-in is completed in the walls and ceilings, and then the plasterboard or hard wall plaster is applied.
Two-storey homes. This step works in reverse: we start at the top and work down, finishing the upper level first as the scaffold is taken down in stages.

Internal finishes and fit-offInside, the finishing work begins. Any remaining plasterboard or plastering is completed, the cabinetry is installed and the tiling is done. The electrical and plumbing fit-offs follow, with lights, power points, tapware and fixtures connected. Towards the end of this step come the flooring and window furnishings such as plantation shutters, both of which we can supply.
Outside. If paving or external concrete for landscaping is part of your contract, it’s done at this stage.

Practical completion and handoverPractical completion. This is the point where the work is essentially finished and we’re very nearly there. We walk through the project with you on site, note anything still to be finished, and the final contract payment is claimed.
Perfecting the finer details. Between practical completion and handover comes a short period of refining: the small touches that make the difference, and finishing off anything not yet complete or held up, such as items waiting on supply. It’s how we make sure the finished result is right in every detail.
Handover. With everything complete, the keys are handed over, along with the documents that come with your home. See what you should receive at handover.
You’ll have: your finished project, built with care and finished to a standard we’re proud to stand behind.
And one more…
The extra stage nobody talks about
Enjoying your home. The planning, decisions and building work are behind you. Now it’s time to enjoy the home you’ve created. And while the work may be finished, we’re still here if anything needs attention down the track.